Project Change Orders
- Get Project Change Order Object Definition
- Query and List Project Change Orders
- Query and List Project Change Orders (Legacy)
- Get Project Change Order
- Get Project Change Order by ID
- Create Project Change Order
- Update Project Change Order
- Delete Project Change Order
You can use project change orders to group change requests in order to present them to the customer for approval, and ultimately, for billing. Your project change order can be associated with a change request status, which is a user-defined object that is shared by change orders and change requests.
After creating a project change order, you can create links from one or more change requests to that change order. To do this, provide the project change order ID when creating or updating change requests.
When you get a project change order, the sum of the total cost for all the linked change requests is provided in the response. This is also true for the total price.
Get Project Change Order Object Definition
lookup
List all the fields and relationships for the project change order object:
<lookup>
<object>PROJECTCHANGEORDER</object>
</lookup>
Parameters
Name | Required | Type | Description |
---|---|---|---|
object | Required | string | Use PROJECTCHANGEORDER |
Query and List Project Change Orders
query
List information for project change orders where the total cost is greater than 1000:
<query>
<object>PROJECTCHANGEORDER</object>
<select>
<field>PROJECTCHANGEORDERID</field>
<field>TOTALCOST</field>
<field>CUSTOMERID</field>
</select>
<filter>
<greaterthan>
<field>TOTALCOST</field>
<value>1000</value>
</greaterthan>
</filter>
</query>
List information for change requests linked to the project change order with the given ID:
<query>
<object>CHANGEREQUEST</object>
<select>
<field>CHANGEREQUESTID</field>
<field>PROJECTCHANGEORDERID</field>
<field>PJCHANGEORDER.TOTALPRICE</field>
<field>TOTALPRICE</field>
</select>
<filter>
<equalto>
<field>PROJECTCHANGEORDERID</field>
<value>PCO-66</value>
</equalto>
</filter>
</query>
Parameters
Name | Required | Type | Description |
---|---|---|---|
object | Required | string | Use PROJECTCHANGEORDER |
filter | Optional | object | Filter expression to limit the response to only objects that match the expression. Check the value of a single field using operators such as equalto/like, or multiple fields using and/or. Query fields on related objects using the dot operator (for example, VENDOR.CREDITLIMIT on APBILL). |
select | Required | sequence | The names of the fields that you want included in the response, and an optional aggregate function such as count or sum . Returning all fields is not supported. |
orderby | Optional | object | Provide an order element with a field name and choose an ascending or descending sort order, for example: <order> |
options | Optional | object | Query options:
|
pagesize | Optional | integer | Maximum number of matching objects to return in the response, between 1 and 2000 items (Default: 100 ) |
offset | Optional | integer | Point at which to start indexing into records (Default: 0 ) |
Query and List Project Change Orders (Legacy)
readByQuery
<readByQuery>
<object>PROJECTCHANGEORDER</object>
<fields>*</fields>
<query/>
<pagesize>100</pagesize>
</readByQuery>
Parameters
Name | Required | Type | Description |
---|---|---|---|
object | Required | string | Use PROJECTCHANGEORDER |
fields | Optional | string | Comma-separated list of fields on the object to list. For best performance and predictability, limit the number of fields. To return all fields, omit the element or provide * for the value. |
query | Required | string | SQL-like query based on fields on the object. The following operators are supported: < , > , >= , <= , = , like , not like , in , not in , IS NOT NULL , IS NULL , AND , OR . Illegal XML characters must be properly encoded, and single quotes must be escaped with backslashes ('Jane\'s Deli' ). Joins are not supported. |
pagesize | Optional | integer | Custom page size between 1 and 1000 items (Default: 100 ) |
Get Project Change Order
read
<read>
<object>PROJECTCHANGEORDER</object>
<keys>66</keys>
<fields>*</fields>
</read>
Parameters
Name | Required | Type | Description |
---|---|---|---|
object | Required | string | Use PROJECTCHANGEORDER |
keys | Required | string | Comma-separated list of RECORDNO of the project change order to get |
fields | Optional | string | Comma-separated list of fields on the object to get. To return all fields, omit the element or provide * for the value.For best performance and predictability, limit the number of fields. |
returnFormat | Optional | string | Data format for the response body:
|
Get Project Change Order by ID
readByName
<readByName>
<object>PROJECTCHANGEORDER</object>
<keys>PCO-66</keys>
<fields>*</fields>
</readByName>
Parameters
Name | Required | Type | Description |
---|---|---|---|
object | Required | string | Use PROJECTCHANGEORDER |
keys | Required | string | Comma-separated list of ID of the project change order to get |
fields | Optional | string | Comma-separated list of fields on the object to get. To return all fields, omit the element or provide * for the value.For best performance and predictability, limit the number of fields. |
returnFormat | Optional | string | Data format for the response body:
|
Create Project Change Order
Release | Changes |
---|---|
2022 Release 2 | Added PROJECTCONTRACTID and PROJECTCONTRACTLINEID |
create
Creates a project change order:
<create>
<PROJECTCHANGEORDER>
<PROJECTCHANGEORDERID>PCO-66</PROJECTCHANGEORDERID>
<PROJECTID>3</PROJECTID>
<ITEMID>Design</ITEMID>
<PROJECTCHANGEORDERDATE>6/30/2021</PROJECTCHANGEORDERDATE>
<CHANGEREQUESTSTATUSNAME>Approved Changes</CHANGEREQUESTSTATUSNAME>
</PROJECTCHANGEORDER>
</create>
Parameters
Name | Required | Type | Description |
---|---|---|---|
PROJECTCHANGEORDER | Required | object | Object type to create. |
PROJECTCHANGEORDER
Name | Required | Type | Description |
---|---|---|---|
PROJECTCHANGEORDERID | Required | string | Unique identifier for the project change order. (This parameter is optional if auto numbering is configured in your company, but you can still overwrite it.) |
PROJECTID | Required | string | ID of an existing project |
ITEMID | Required | string | Item ID |
PROJECTCHANGEORDERDATE | Required | string | Date for the project change order in the mm/dd/yyyy format |
DESCRIPTION | Optional | string | Description for the project change order. |
PROJECTCHANGEORDERSTATE | Optional | string | State of the project change order.
|
CHANGEREQUESTSTATUSNAME | Optional | string | Name of a change request status to be inherited by linked change requests. |
PREOJECTCONTRACTID | Optional | string | PROJECTCONTRACTID of the project contract affected by this change order. Not allowed if PROJECTCHANGEORDERSTATE == Draft . Required if PROJECTCONTRACTLINEID is provided. |
PROJECTCONTRACTLINEID | Optional | string | PROJECTCONTRACTLINEID of the specific project contract line that is affected by this change order. Not allowed if PROJECTCHANGEORDERSTATE == Draft . Required if PROJECTCONTRACTID is provided. |
PRICEEFFECTIVEDATE | Optional | date | Price effective date of the project change order. Setting a value or null for this field will automatically set the PRICEEFFECTIVEDATE field on all linked change requests. |
SCOPE | Optional | string | Details about the expected scope of work for the change request. Use 4000 or fewer characters. |
INCLUSIONS | Optional | string | Details related to items that are explicitly included in the terms of this change request. Use 4000 or fewer characters. |
EXCLUSIONS | Optional | string | Details related to items that are explicitly excluded in the terms of this change request. Use 4000 or fewer characters. |
TERMS | Optional | string | Additional terms or performance obligations. Use 4000 or fewer characters. |
SCHEDULEDSTARTDATE | Optional | date | Scheduled start date in the mm/dd/yyyy format |
ACTUALSTARTDATE | Optional | date | Actual start date in the mm/dd/yyyy format |
SCHEDULEDCOMPLETIONDATE | Optional | date | Original scheduled date for completion of the work in the mm/dd/yyyy format |
REVISEDCOMPLETIONDATE | Optional | date | Revised completion date for the work (caused by changes) in the mm/dd/yyyy format. |
SUBSTANTIALCOMPLETIONDATE | Optional | date | Date the work is considered substantially complete in the mm/dd/yyyy format. Typically used as a milestone to identify when payment obligations are due. |
ACTUALCOMPLETIONDATE | Optional | date | Date the work is actually complete in the mm/dd/yyyy format |
NOTICETOPROCEED | Optional | date | Date when a formal notice to proceed was given in the mm/dd/yyyy format |
RESPONSEDUE | Optional | date | Date when a response is expected from an external party in the mm/dd/yyyy format |
EXECUTEDON | Optional | date | Date the related contract document was formally executed in the mm/dd/yyyy format |
SCHEDULEIMPACT | Optional | string | Details about any impacts on the current schedule. Use 100 or fewer characters. |
INTERNALREFNO | Optional | string | Specifies an internal reference ID |
INTERNALINITIATEDBYKEY | Optional | integer | Record number of the employee who initiated the change request |
INTERNALINITIATEDBY | Optional | string | ID of the employee who initiated the change request |
INTERNALINITIATEDBYNAME | Optional | string | Name of the employee who initiated the change request |
INTERNALVERBALBYKEY | Optional | integer | Record number of of the employee who verbally agreed to the change request |
INTERNALVERBALBY | Optional | string | ID of the employee who verbally agreed to the change request |
INTERNALVERBALBYNAME | Optional | string | Name of the employee who verbally agreed to the change request |
INTERNALISSUEDBYKEY | Optional | integer | Record number of the employee who issued the change request |
INTERNALISSUEDBY | Optional | string | ID of the employee who issued the change request |
INTERNALISSUEDBYNAME | Optional | string | Name of the employee who issued the change request |
INTERNALISSUEDON | Optional | date | Date this change request was internally issued in the mm/dd/yyyy format |
INTERNALAPPROVEDBYKEY | Optional | integer | Record number of the employee who internally approved the change request. |
INTERNALAPPROVEDBY | Optional | string | ID of the employee who internally approved the change request |
INTERNALAPPROVEDBYNAME | Optional | string | Name of the employee who internally approved the change request |
INTERNALAPPROVEDON | Optional | date | Date this change request was internally approved in the mm/dd/yyyy format |
INTERNALSIGNEDBYKEY | Optional | integer | Record number of the employee who signed for the change request |
INTERNALSIGNEDBY | Optional | string | ID of the employee who signed for the change request |
INTERNALSIGNEDBYNAME | Optional | string | Name of the employee who signed for the change request |
INTERNALSIGNEDON | Optional | date | Date the change request was internally signed in the mm/dd/yyyy format. |
INTERNALSOURCE | Optional | string | Internal source when the change request originated from another document or workflow. Can be an internal or external source. For example, a request for information (RFI) or a project change request. Use 100 or fewer characters. |
INTERNALSOURCEREFNO | Optional | string | Internal source reference number or ID when the change request originated from another source. Can be an internal or external number. Use 100 or fewer characters. |
EXTERNALREFNO | Optional | string | External reference number, such as one required by a vendor or customer, for this change request. Use 100 or fewer characters. |
EXTERNALVERBALBYKEY | Optional | integer | Record number of the contact who verbally agreed to the change request. For example, a customer or vendor contact. |
EXTERNALVERBALBY | Optional | string | Name of the contact who verbally agreed to the change request. For example, a customer or vendor contact. |
EXTERNALAPPROVEDBYKEY | Optional | integer | Record number of the contact who approved the change request. For example, a customer or vendor contact. |
EXTERNALAPPROVEDBY | Optional | string | Name of the contact who approved the change request. For example, a customer or vendor contact. |
EXTERNALAPPROVEDON | Optional | date | Date the customer or vendor approved the change request in the mm/dd/yyyy format |
EXTERNALSIGNEDBYKEY | Optional | integer | Record number of the contact who signed the change request. For example, a customer or vendor contact. |
EXTERNALSIGNEDBY | Optional | string | Name of the contact who signed the change request. For example, a customer or vendor contact. |
EXTERNALSIGNEDON | Optional | date | Date the customer or vendor signed for the change request the mm/dd/yyyy format |
SUPDOCID | Optional | string | Attachments ID |
Custom field name | varies | varies | Custom field names and values as defined for this object. For a multi-pick-list custom field, implode multiple field values with #~# . |
customfield
Name | Required | Type | Description |
---|---|---|---|
customfieldname | Optional | string | Custom field ID |
customfieldvalue | Optional | varies | Custom field value. For a multi-pick-list custom field, implode multiple field values with #~# . |
Update Project Change Order
Release | Changes |
---|---|
2022 Release 2 | Added PROJECTCONTRACTID and PROJECTCONTRACTLINEID |
update
Sets the change request status of a project change order to
Approved Changes
:
<update>
<PROJECTCHANGEORDER>
<PROJECTCHANGEORDERID>PCO-66</PROJECTCHANGEORDERID>
<CHANGEREQUESTSTATUSNAME>Approved Changes</CHANGEREQUESTSTATUSNAME>
</PROJECTCHANGEORDER>
</update>
Parameters
Name | Required | Type | Description |
---|---|---|---|
PROJECTCHANGEORDER | Required | object | Object to update |
PROJECTCHANGEORDER
Name | Required | Type | Description |
---|---|---|---|
RECORDNO | Optional | integer | RECORDNO of the project change order to update. Required if not using PROJECTCHANGEORDERID . |
PROJECTCHANGEORDERID | Optional | string | Unique identifier for the project change order to update. Required if not using RECORDNO . |
PROJECTID | Optional | string | ID of an existing project |
ITEMID | Optional | string | Item ID |
PROJECTCHANGEORDERDATE | Optional | string | Date for the project change order in the mm/dd/yyyy format |
DESCRIPTION | Optional | string | Description for the project change order. |
PROJECTCHANGEORDERSTATE | Optional | string | State of the project change order, either Draft or Posted . Does not affect the state of linked change requests. You cannot change the state from Posted to Draft . (Default: Draft ) |
CHANGEREQUESTSTATUSNAME | Optional | string | Name of a change request status to be inherited by linked change requests. |
PREOJECTCONTRACTID | Optional | string | PROJECTCONTRACTID of the project contract affected by this change order. Not allowed if PROJECTCHANGEORDERSTATE == Draft . Required if PROJECTCONTRACTLINEID is provided. |
PROJECTCONTRACTLINEID | Optional | string | PROJECTCONTRACTLINEID of the specific project contract line that is affected by this change order. Not allowed if PROJECTCHANGEORDERSTATE == Draft . Required if PROJECTCONTRACTID is provided. |
PRICEEFFECTIVEDATE | Optional | date | Price effective date of the project change order. Updating this field will automatically update the PRICEEFFECTIVEDATE field on all linked change requests. |
SCOPE | Optional | string | Details about the expected scope of work for the change request. Use 4000 or fewer characters. |
INCLUSIONS | Optional | string | Details related to items that are explicitly included in the terms of this change request. Use 4000 or fewer characters. |
EXCLUSIONS | Optional | string | Details related to items that are explicitly excluded in the terms of this change request. Use 4000 or fewer characters. |
TERMS | Optional | string | Additional terms or performance obligations. Use 4000 or fewer characters. |
SCHEDULEDSTARTDATE | Optional | date | Scheduled start date in the mm/dd/yyyy format |
ACTUALSTARTDATE | Optional | date | Actual start date in the mm/dd/yyyy format |
SCHEDULEDCOMPLETIONDATE | Optional | date | Original scheduled date for completion of the work in the mm/dd/yyyy format |
REVISEDCOMPLETIONDATE | Optional | date | Revised completion date for the work (caused by changes) in the mm/dd/yyyy format. |
SUBSTANTIALCOMPLETIONDATE | Optional | date | Date the work is considered substantially complete in the mm/dd/yyyy format. Typically used as a milestone to identify when payment obligations are due. |
ACTUALCOMPLETIONDATE | Optional | date | Date the work is actually complete in the mm/dd/yyyy format |
NOTICETOPROCEED | Optional | date | Date when a formal notice to proceed was given in the mm/dd/yyyy format |
RESPONSEDUE | Optional | date | Date when a response is expected from an external party in the mm/dd/yyyy format |
EXECUTEDON | Optional | date | Date the related contract document was formally executed in the mm/dd/yyyy format |
SCHEDULEIMPACT | Optional | string | Details about any impacts on the current schedule. Use 100 or fewer characters. |
INTERNALREFNO | Optional | string | Specifies an internal reference ID |
INTERNALINITIATEDBYKEY | Optional | integer | Record number of the employee who initiated the change request |
INTERNALINITIATEDBY | Optional | string | ID of the employee who initiated the change request |
INTERNALINITIATEDBYNAME | Optional | string | Name of the employee who initiated the change request |
INTERNALVERBALBYKEY | Optional | integer | Record number of of the employee who verbally agreed to the change request |
INTERNALVERBALBY | Optional | string | ID of the employee who verbally agreed to the change request |
INTERNALVERBALBYNAME | Optional | string | Name of the employee who verbally agreed to the change request |
INTERNALISSUEDBYKEY | Optional | integer | Record number of the employee who issued the change request |
INTERNALISSUEDBY | Optional | string | ID of the employee who issued the change request |
INTERNALISSUEDBYNAME | Optional | string | Name of the employee who issued the change request |
INTERNALISSUEDON | Optional | date | Date this change request was internally issued in the mm/dd/yyyy format |
INTERNALAPPROVEDBYKEY | Optional | integer | Record number of the employee who internally approved the change request. |
INTERNALAPPROVEDBY | Optional | string | ID of the employee who internally approved the change request |
INTERNALAPPROVEDBYNAME | Optional | string | Name of the employee who internally approved the change request |
INTERNALAPPROVEDON | Optional | date | Date this change request was internally approved in the mm/dd/yyyy format |
INTERNALSIGNEDBYKEY | Optional | integer | Record number of the employee who signed for the change request |
INTERNALSIGNEDBY | Optional | string | ID of the employee who signed for the change request |
INTERNALSIGNEDBYNAME | Optional | string | Name of the employee who signed for the change request |
INTERNALSIGNEDON | Optional | date | Date the change request was internally signed in the mm/dd/yyyy format. |
INTERNALSOURCE | Optional | string | Internal source when the change request originated from another document or workflow. Can be an internal or external source. For example, a request for information (RFI) or a project change request. Use 100 or fewer characters. |
INTERNALSOURCEREFNO | Optional | string | Internal source reference number or ID when the change request originated from another source. Can be an internal or external number. Use 100 or fewer characters. |
EXTERNALREFNO | Optional | string | External reference number, such as one required by a vendor or customer, for this change request. Use 100 or fewer characters. |
EXTERNALVERBALBYKEY | Optional | integer | Record number of the contact who verbally agreed to the change request. For example, a customer or vendor contact. |
EXTERNALVERBALBY | Optional | string | Name of the contact who verbally agreed to the change request. For example, a customer or vendor contact. |
EXTERNALAPPROVEDBYKEY | Optional | integer | Record number of the contact who approved the change request. For example, a customer or vendor contact. |
EXTERNALAPPROVEDBY | Optional | string | Name of the contact who approved the change request. For example, a customer or vendor contact. |
EXTERNALAPPROVEDON | Optional | date | Date the customer or vendor approved the change request in the mm/dd/yyyy format |
EXTERNALSIGNEDBYKEY | Optional | integer | Record number of the contact who signed the change request. For example, a customer or vendor contact. |
EXTERNALSIGNEDBY | Optional | string | Name of the contact who signed the change request. For example, a customer or vendor contact. |
EXTERNALSIGNEDON | Optional | date | Date the customer or vendor signed for the change request the mm/dd/yyyy format |
SUPDOCID | Optional | string | Attachments ID |
Custom field name | varies | varies | Custom field names and values as defined for this object. For a multi-pick-list custom field, implode multiple field values with #~# . |
customfield
Name | Required | Type | Description |
---|---|---|---|
customfieldname | Optional | string | Custom field ID |
customfieldvalue | Optional | varies | Custom field value. For a multi-pick-list custom field, implode multiple field values with #~# . |
Delete Project Change Order
delete
<delete>
<object>PROJECTCHANGEORDER</object>
<keys>66</keys>
</delete>
Parameters
Name | Required | Type | Description |
---|---|---|---|
object | Required | string | Use PROJECTCHANGEORDER |
keys | Required | integer | RECORDNO of the project change order to delete |